Content calendar
31
Scheduled this month
6
Waiting on review
2
Approvals invalidated
48
Pre-approved claims
September 2026
What matters here
- A content calendar with approvals is four parts: one calendar, content-driven review routing, resolvable feedback, and a published record.
- Route review by what the content contains, not by who usually reviews. Customer names, claims and pricing each have a specific approver.
- One calendar for every channel. Separate calendars per team is how two campaigns land on the same day.
- Feedback needs a resolvable state. A comment thread with no resolution is how a required change gets missed.
- Approvals must be bound to a version. Approving a draft that is then edited is the most common failure in any review process.
- Keep what actually published, separately from the plan. Six months later the question is what went out, not what was scheduled.
Who this is for
You run content, marketing operations or brand. You already have a calendar and an approval process, probably in different places. What you want is for review to happen automatically where it is needed and nowhere else.
How it works in practice
How a piece of content gets from an idea to a published record, and what stops the wrong claim going out.
- 1
Everything sits on one calendar
Blog, email, social, web, events, launches and paid. Separate calendars per team is how two campaigns land on the same day.
- 2
The author answers a short checklist at submission
Does it name a customer, make a claim, mention pricing, commit to future functionality, quote someone, use a partner brand.
- 3
The draft gets scanned as a safety net
Percentages, superlatives, currency amounts and known customer names. A mismatch with the checklist is flagged for the author to confirm.
- 4
Reviewers are derived, not chosen
The author never picks who reviews. Remembering which reviewer a claim needs is precisely what fails.
- 5
Feedback has to be resolved, not just read
Required change, suggestion or question, each with a state. Approval is blocked while a required change is open.
- 6
Editing after approval invalidates it
And says which approvals and why. That single rule prevents a whole class of problem.
What a content calendar is made of
A content calendar with approvals is not a spreadsheet with a status column. It is four parts, and the second is what stops an uncleared claim reaching a customer.
One calendar
Every channel in one view: blog, email, social, web, events, product announcements, and paid. With owner, status, target date and campaign.
Content-driven routing
Review requirements derived from what the piece contains and where it will run: a customer name, a performance claim, pricing, a product commitment, or a regulated topic.
Resolvable feedback
Each comment has a state and an owner, and required changes must be resolved before approval. A thread with no resolution is how a required change gets missed.
A published record
What actually went out, when, at what URL, in what final version, with the approvals attached. Separate from the plan, because the two diverge.
The prompts
Paste these into Claude Code, Codex or Cursor in order. Each one leaves you with something that runs, so you can stop after any step.
These prompts start from a Helix project, which is what handles sign-in, credentials and hosting. Start with Helix.
One calendar, every channel
Because separate ones are how collisions happen.
Create a Helix app: a content calendar with approvals.
One record per item: title, type, channel, campaign, author, owner, target publish date, actual publish date, status, audience, primary message, url, and a link to the draft.
Types to seed: blog post, email, social post, landing page, press release, customer story, product announcement, webinar, paid ad.
Give me a calendar view filterable by channel, campaign, owner and status, and a list view for people who prefer one. One calendar covering every channel, with filters, rather than one per team. Separate calendars are how two campaigns land on the same day and how an email goes out before the page it links to.
Add conflict detection: more than one item in the same channel on the same day, or two items aimed at the same audience in the same week. Warn, do not block.
And a campaign view that groups every item in a campaign with its dependency order, so it is obvious when something is scheduled out of sequence.
Route review by what the content contains
Not by what the author remembers.
Now the rule that prevents the worst outcome.
Put review rules in a config file. Each has a trigger and the reviewer role it requires. Seed it with: names a customer, makes a performance or comparison claim, mentions pricing, commits to future functionality, quotes a person, uses a partner or third-party brand, touches a regulated topic, targets a regulated market.
The author answers a short checklist at submission and the app derives the required reviewers from the answers. Do not ask the author to pick reviewers. Relying on memory is exactly the failure this exists to prevent.
Then add a safety net: scan the draft for signals that contradict the checklist, like a percentage, a superlative, a currency amount, or a customer name from a list I maintain. Flag any mismatch for the author to confirm before submitting.
Show the author which reviewers their answers triggered and why. Route reviews in parallel where they are independent, in sequence where one depends on another.
Feedback that cannot quietly go unaddressed
And approvals that mean a specific version.
Reviewers see the draft, the checklist answers, why they were routed in, and what they are being asked to confirm. A legal reviewer looking at one claim should not have to read a whole blog post to find it.
Give comments a type: required change, suggestion, or question. Each has a state of open or resolved and an owner. Approval is blocked while any required change is open. A suggestion never blocks.
Then the rule that prevents a whole class of problem: bind approvals to a specific version. Editing a draft after approval invalidates the affected approvals and says which and why. It is unpopular for about a week and then nobody wants to go back.
Add deputies per reviewer role with automatic reroute, and derive a due date on every review from the publish date minus a lead time I configure per content type. Give the author one view of everything outstanding and who holds it.
The published record, and how to need less review
What went out, and the claims library that shrinks the queue.
On publish, record the actual date, the final version, the live url, and the approvals in place at that moment. Keep that separately from the planned item, because plans and reality diverge and the record is what matters later.
Make the archive searchable by claim type, customer named, and campaign. When a customer relationship changes or a claim is retired, "where have we said this" needs an answer in minutes.
Report published against planned by month and channel, average time in review by reviewer role, and items published without a required approval, which should be zero. Plus the most frequently triggered review rules.
Then use that last report to build a pre-approved claims library: statements already cleared, with expiry dates, that authors can use without triggering a review. Most review load is the same claims being cleared over and over, and this is where the time comes back.
Connect it to real systems
The step that turns a working prototype into something with your data in it.
Now connect it to the systems we actually run, so it works on real data rather than the rows you seeded.
Anything in angle brackets is a placeholder. Swap it for whatever we use instead, and have the app name the connection it wants rather than assume a vendor, so changing my mind later is a config change and not a rewrite.
<Google Drive>. Read the draft to scan for claims, customer names and pricing, which is the safety net under the checklist.
<Okta>. Resolve reviewer roles, so an approval carries a verified identity.
<Contentful>. Read what actually published and when, and the live url for the record.
<Slack>. Route reviews and chase them against the lead time for that content type.
<Google Analytics>. Attach performance to each published item, so the archive is not just a record.
<Notion>. Read drafts where writers actually work, rather than asking them to move.
<Gmail>. Send the review request with the specific claim highlighted, not the whole post.
<Snowflake>. Keep the published record queryable, so where-have-we-said- this is a query.
Only write where I have said to write. Everything else is read only.
Ship it
The last step of every build: a URL, and the right people on it.
Deploy my app.
What it connects to
Routing review by what the content contains means the app has to see the draft.
-
Google Drive Read the draft to scan for claims, customer names and pricing, which is the safety net under the checklist. Reads
-
Okta Resolve reviewer roles, so an approval carries a verified identity. Reads -
Contentful Read what actually published and when, and the live url for the record. Reads -
Slack Route reviews and chase them against the lead time for that content type. Writes
-
Google Analytics Attach performance to each published item, so the archive is not just a record. Reads
-
Notion Read drafts where writers actually work, rather than asking them to move. Reads
-
Gmail Send the review request with the specific claim highlighted, not the whole post. Writes
-
Snowflake Keep the published record queryable, so where-have-we-said-this is a query. Writes
Named systems are the ones most teams actually run, not a list of the only ones that work. Swap in whatever you use.
Running it for real
The build gets you a working calendar. It holds unpublished plans and the approval record behind public claims, so how it is run matters.
- 1
Get it to a URL people can open
One command takes the app from your assistant to a live address, so the people who need it get a link rather than instructions for running it locally.
- 2
Put your identity provider in front of it
Unpublished plans and legal review comments are confidential, and an approval is only evidence if the identity behind it is verified. SSO verifies the identity behind an approval, and scoped access keeps the plans and the comments to the people reviewing them.
- 3
Connect the system of record with managed credentials
Pulling analytics for published items and pushing scheduled content to publishing tools needs real access. Granting it to the app rather than pasting keys into it means credentials can be rotated or revoked without a redeploy.
- 4
Put a name on it
Every app carries a named owner and an entry IT can see, so the tool does not become nobody's problem when the person who built it changes role.
- 5
Know what it costs to run
Per-app spend visibility, so an internal tool cannot quietly become a line item nobody can explain.