Renewals
3
Past engagement date
4.1M
Renewing this quarter
108%
Net revenue retention
2
Committed but declining
Halden Foods
410K · overdue 11 days
Kestrel Ltd
64K · engage in 88 days
Northrise Group
240K · engage in 6 days
Vantor
135K · committed
Brightsea
88K · likely
What matters here
- A renewal tracker is four parts: contract terms with notice dates, a stage model, an owner and plan per renewal, and a forecast with reasons.
- Work backwards from the notice date. A renewal opened 30 days out is a price negotiation, not a value conversation.
- Stages need entry criteria. Without them, everything sits in the middle stage until the month it closes.
- Forecast categories need a stated reason, not a percentage. A reason can be argued with and a probability cannot.
- Track expansion and contraction alongside renewal. A renewed contract at 60% of its value is not a win.
- A renewal tracker produces a number leadership quotes in a board meeting, so who may change a forecast category deserves as much thought as the model behind it.
Who this is for
You run customer success, renewals or revenue operations. You already know your contract dates. What you want is for every renewal to be worked on a schedule set by its notice period, and for the forecast to be something you can defend line by line.
How it works in practice
How a renewal gets worked, starting far earlier than most teams start.
- 1
Two dates get derived, and both matter more than the renewal date
Notice deadline is contract end minus notice period. Engagement date is that minus your own lead time, and it is when work has to start.
- 2
Anything past its engagement date is the first thing you see
That list is the reason to build this at all.
- 3
Each renewal moves through stages with entry criteria
Otherwise everything sits in the middle stage until the month it closes and the pipeline tells you nothing.
- 4
Every renewal has an owner and a plan
The customer decision-maker, the specific risks, the value evidence to present, and the next step with a date.
- 5
Forecast categories carry a reason, not a percentage
Nobody can argue with 60 percent. Everybody can argue with a stated reason, which is the point.
- 6
Usage and health sit on the record
So a committed forecast on a declining account is visible as a contradiction rather than a surprise.
What a renewal tracker is made of
A renewal tracker is not a filtered list of contract end dates. It is four parts, and the first one changes when the work starts.
Contract terms
Value, term dates, auto-renew flag, notice period, uplift clauses, and the derived notice deadline. Plus the derived date to open the conversation, which is the notice deadline minus your own lead time.
A stage model
The steps a renewal moves through, each with entry criteria and an expected duration: not started, discovery, value review, proposal, negotiation, closed. Criteria are what stop everything piling in the middle.
An owner and a plan
One named owner, a decision-maker identified on the customer side, the risks specific to this renewal, and the next step with a date.
A forecast
Each renewal categorized with a reason, rolled up by period, with expansion and contraction tracked separately from the base renewal value.
The prompts
Paste these into Claude Code, Codex or Cursor in order. Each one leaves you with something that runs, so you can stop after any step.
These prompts start from a Helix project, which is what handles sign-in, credentials and hosting. Start with Helix.
Work backwards from the date that actually decides it
Two derived dates, and the list they produce.
Create a Helix app: a renewal tracker.
Load contracts: account, product, annual value, currency, term start and end, whether it auto-renews, the notice period in days, any contractual uplift, payment terms, and an owner.
Now derive two dates and treat both as more important than the contract end. The notice deadline, which is term end minus notice period. And the engagement date, which is the notice deadline minus a lead time I configure per contract value band. A large enterprise renewal needs to open six months out and a small one needs six weeks, and one global setting serves neither.
Then show me the next twelve months ordered by engagement date, with days remaining, value, owner and stage. And put anything already past its engagement date and not started at the very top. That list is the entire reason for building this.
Stages with entry criteria
A process rather than a date and some optimizm.
Add stages, in a config file: an ordered list with entry criteria and an expected duration. Start with not started, discovery, value review, proposal, negotiation, closed won, closed lost, and let me edit them.
Show the entry criteria when somebody moves a renewal into a stage, and record who moved it and when. Without criteria, everything piles up in the middle stage until the month it closes and the pipeline tells you nothing you did not already know.
Give each renewal a plan: the customer decision-maker and their role, the known risks, the value evidence to present, and the next step with a date and an owner.
Flag any renewal that has been in a stage longer than its expected duration.
A forecast someone can interrogate
Reasons instead of probabilities.
Now the forecast, and do one thing differently from every CRM.
Categories are committed, likely, at risk and lost. Whenever a renewal is set to at risk or lost, require a reason chosen from a short editable list. Not a probability. Nobody can argue with 60 percent, and everybody can argue with "champion left and the replacement has not engaged", which is the conversation you actually want.
Roll up by quarter: base renewal value, expansion, contraction, and the net. Derive gross renewal rate and net revenue retention from those rather than letting anyone type them. A contract renewed at 60 percent of its size is not a win, and a tracker that only asks whether it renewed will record it as one.
Show the forecast three ways, committed only, committed plus likely, and full pipeline, so a leadership conversation can happen without anyone arguing about which number is meant. Snapshot it weekly and chart how each quarter's number moved. The shape of that line teaches a team more about its own optimizm than any coaching.
Connect it to what the account is doing
The mismatch alert, which is the whole reason to build this next to a health score.
If I connect them, pull per-account signals onto the renewal record: usage trend, open escalations, ticket volume, health score, days since the last meeting.
Then build the single most useful alert in the app: any renewal where a signal is deteriorating and the forecast category is still committed. That contradiction is what a renewal tracker can see and a health dashboard on its own cannot.
On closure, record the outcome, the final value, a reason from a fixed list, and free text. Then report renewal rate by segment, owner and contract size, loss reasons over time, and how accurate each forecast category turned out to be once quarters closed. Flag any lost renewal above a value threshold for a post-loss review with an owner and a due date.
Connect it to real systems
The step that turns a working prototype into something with your data in it.
Now connect it to the systems we actually run, so it works on real data rather than the rows you seeded.
Anything in angle brackets is a placeholder. Swap it for whatever we use instead, and have the app name the connection it wants rather than assume a vendor, so changing my mind later is a config change and not a rewrite.
<Salesforce>. Read renewal opportunities and write the forecast category and decision back.
<Stripe>. Read subscription term dates, billing schedule and value, which is where the engagement date comes from.
<Amplitude>. Pull the usage trend, so a committed forecast on a declining account shows as the contradiction it is.
<Google Calendar>. Put the engagement date in the owner's calendar, so preparing for the conversation is scheduled rather than remembered.
<Okta>. Resolve owners and their manager chain, which is what the app uses to show a rep their renewals and leadership the roll-up.
<Zendesk>. Read open escalations, so a committed forecast on an unhappy account shows as the contradiction it is.
<Snowflake>. Read the usage and payment history behind each renewal, which is the evidence for the conversation.
<Slack>. Warn the owner at the engagement date, which is months before the renewal date.
Only write where I have said to write. Everything else is read only.
Ship it
The last step of every build: a URL, and the right people on it.
Deploy my app.
What it connects to
Renewals are worked from contract data and decided on account behavior, and those live apart.
-
Salesforce Read renewal opportunities and write the forecast category and decision back. Reads and writes
-
Stripe Read subscription term dates, billing schedule and value, which is where the engagement date comes from. Reads
-
Amplitude Pull the usage trend, so a committed forecast on a declining account shows as the contradiction it is. Reads -
Google Calendar Put the engagement date in the owner's calendar, so preparing for the conversation is scheduled rather than remembered. Writes
-
Okta Resolve owners and their manager chain, which is what the app uses to show a rep their renewals and leadership the roll-up. Reads -
Zendesk Read open escalations, so a committed forecast on an unhappy account shows as the contradiction it is. Reads -
Snowflake Read the usage and payment history behind each renewal, which is the evidence for the conversation. Reads -
Slack Warn the owner at the engagement date, which is months before the renewal date. Writes
Named systems are the ones most teams actually run, not a list of the only ones that work. Swap in whatever you use.
Running it for real
The build gets you a working tracker. It holds contract terms, feeds a revenue forecast and shapes customer conversations, so it needs to be run properly.
- 1
Get it to a URL people can open
One command takes the app from your assistant to a live address, so the people who need it get a link rather than instructions for running it locally.
- 2
Put your identity provider in front of it
Contract values and at-risk reasons are commercially sensitive. SSO means people sign in with their existing account, and access is scoped so an owner sees their renewals while leadership sees the roll-up.
- 3
Connect the system of record with managed credentials
Reading contracts, usage and health signals needs real access to those systems. Granting it to the app rather than pasting keys into it means credentials can be rotated or revoked without a redeploy.
- 4
Put a name on it
Every app carries a named owner and an entry IT can see, so the tool does not become nobody's problem when the person who built it changes role.
- 5
Know what it costs to run
Per-app spend visibility, so an internal tool cannot quietly become a line item nobody can explain.
Do this as a workflow instead
An app is only as good as the data in it. These build the integrations and automations that keep this one current, on the Tray platform. Same kind of guide, same kind of prompts.